We recently deployed our Rope Access Team to take a number of Concrete Cores to a High Rise Tower Block in Birmingham.
The Concrete Cores were taken in various locations on each elevation of the High Rise Tower Block in Birmingham to be sent for Laboratory analysis for compressive or petrographic testing.
The results of the testing will determine if any deterioration has occurred thus allowing for further works to be carried out.
Our Rope Access Team carried out the sampling using a drilling rig weighing in at over 100kg which required a hauling safety system to be rigged up by our Rope Access IRATA Level 3