PROBLEM

Falling masonry from high level, possibly caused by water ingress from previous sub standard repairs.

LOCATION OF PROBLEM

Centro House in Summer Lane, Birmingham, directly above the main entrance and generally all elevations to both 5th floor building and 12th floor building.

SOLUTION

Complete Access utilised a Team of two Rope Access IRATA Level 3’s to carry out a make safe and full defect survey identifying each location where masonry spalling had occurred or had the potential to dislodge. Our Technicians removed a substantial amount of failed previous repairs, delaminated concrete and mosaic tiles.

Upon completion of the survey report, specialist protection was applied to exposed reinforced steel and mortar repairs carried out to exposed substrate.