We were recently contacted to replace a large number of single pane glazed units to a Listed Building in Birmingham City Centre.
The Building itself is owned by HRH The Queen and it was a pleasure to have continued and repeat work on this Building using our Rope Access Team.
The replacement of the glazing was problematic for MEWP or scaffolding to be erected, mainly due to the city centre location and cost.
Our Rope Access Team visited the site to measure up individual glazing panels that needed replacing and placed an order with a Local Glazing Company which reflects on our Social Values.
We deployed our Rope Access Team to Birmingham City Centre to carry out the replacement of the gazing.
Our Rope Access Team replace the glazed units using a traditional method of glazing using putty as a fixing medium.
Upon completion, our Rope Access Team returned to re-coat the window apertures to make ensure the longevity.