SCHEDULE OF WORKS

We were tasked to carry out a full structural defect survey to a disused underground service tunnel for Cadbury’s. The tunnel location was directly underneath a proposed new cargo loading bay which was going to received thousands of tonnes of cargo each day. Our task involved taking incremental concrete samples, providing tunnel measurements and inspection of Victorian brick structure.

SOLUTION

Complete Access utilised a Team of two Rope Access IRATA / Confined Space operatives to carry out the  survey. A comprehensive report was prepared detailing sampled areas, condition and dimensions of tunnel.